What to take away
- Hire against the work sequence, not a job title. Name the steps in the posting.
- Pay from the OEWS metro wage row plus a burden multiplier you wrote down, then check the break-even rate before you offer.
- Verify the licence and the training record with the issuing body, not with a photocopy.
- Onboard in four stages, each with a named observer and a date.
- Review overtime, call-offs and drive time monthly. Three months of rising overtime usually means a hire.
This article is US first: state licensing boards, OSHA and the Department of Labor lead. Canadian bodies appear as a labelled second market.
Pay from OEWS data plus a burden you wrote down
The BLS Occupational Employment and Wage Statistics tables publish wages by occupation, industry, state and metro. Electricians have their own code, with a metro row for each area. Use the row where you hire.
A wage is not a cost. Add burden: payroll taxes, workers' compensation at a high-risk classification, the van, tools, phone, training hours and unpaid drive time. Margin protection when those costs move is covered in electrical contractor pricing that protects profit.
Typical multipliers run from 1.35 to 1.6 for service work, higher where workers' compensation is expensive. Write yours down and apply it every time.
Six roles carry most of the payroll
Six roles carry most payroll. Each takes a different pay input, and in most states two of them must hold a licence.
Roles and Pay Inputs
Role
- Apprentice
- Rough-in, material handling
- Journeyperson
- Installation, testing, troubleshooting
- Master electrician
- Permit signature, design, code
- Estimator
- Takeoff, labour hours, bid
- Service coordinator
- Dispatch, customer calls, warranty
- Project manager
- Schedule, subcontractors, holdback
Owns
- Apprentice
- OEWS hourly by year
- Journeyperson
- OEWS metro rate plus ticket
- Master electrician
- Journeyperson plus licence premium
- Estimator
- Salary survey or OEWS estimating
- Service coordinator
- OEWS office and admin support
- Project manager
- Salary survey plus project volume
Pay Input
- Apprentice
- Journeyperson
- Master electrician
- Estimator
- Service coordinator
- Project manager
| Role | Owns | Pay input |
|---|---|---|
| Apprentice | Rough-in, material handling, supervised terminations | OEWS hourly rate by apprenticeship year |
| Journeyperson | Installation, testing, troubleshooting | OEWS metro rate plus ticket premium |
| Master electrician | Permit signature, design, code calls | Journeyperson rate plus licence premium |
| Estimator | Takeoff, labour hours, bid price | Salary survey or construction estimating data |
| Service coordinator | Dispatch, warranty scheduling, customer calls | Office and administrative support wage data |
| Project manager | Schedule, subcontractors, change orders | Salary survey scaled to project volume |
The estimator never touches a panel and still sets the number the job rests on.
Which roles your state regulates, and whether a licence crosses a state line, is covered in electrical contractor license requirements.
Example: break-even labour rate for a service journeyperson
Run three numbers before you make an offer.
Break-even labour rate
- Billable hours equal paid hours minus vacation, holidays, training, sick time and drive time.
- Annual cost equals annual wage plus annual burden.
- Break-even rate equals annual cost divided by billable hours.
Take a wage of $32 an hour as a stand-in for your own OEWS metro figure, with a 1.4 multiplier. Paid hours of 2,080 fall to about 1,600 billable after five weeks off, training and drive time. Annual cost lands near $93,000, so break-even is close to $58 an hour.
That figure is a ceiling on pay, not a target. If the market pays less for the same work, the job is priced wrong rather than staffed wrong, and more overtime will not close the gap.
The overhead and margin side of the sum is set out in where an electrical contractor business actually makes money.
Verify the licence with the board that issued it
A card is a claim until someone checks it. In the US, start with the state licensing board's public register. Some states license at state level; others leave it to counties and cities, so check both.
Canada is a separate market here. Red Seal endorsements are verified through the provincial apprenticeship authority that issued them. Ontario's ESA, Technical Safety BC, Alberta Municipal Affairs and Quebec's CCQ each publish a verification path.
Add the driver's abstract for roles that drive a company vehicle, and the energy-control training record for anyone servicing equipment that can be energized.
Onboarding in four stages, each with a sign-off
A four-week orientation that ends with "you are on your own" puts a full workload on partial competence. Stage it against the work sequence instead.
Four-Week Onboarding Sequence
- Week onePolicies, PPE, vehicle, energy-control program, no field work
- Week twoShadow journeyperson through site assessment and permits
- Week threePerform work under direct observation with sign-off
- Week fourIndependent low-risk tasks with escalation contact
Onboarding in four stages
- Days 1 to 3policies, vehicle, PPE fit, records filed.
- Week 1shadow a journeyperson through assessment, permit and lockout planning. No solo work.
- Weeks 2 and 3installation under direct observation, each step signed off by name and date.
- Week 4low-risk service calls alone, with an end-of-day check-in.
Order van stock and PPE before day one. Reviewing electrical contractor equipment covers what a second van actually needs.
Nobody services or maintains equipment that can be energized until the written energy-control program exists and the training record is filed. OSHA 1910.147 makes that an employer duty.
Overtime, seasonal swings and call-offs
New-build work follows construction cycles and service work follows weather, so overtime arrives in bursts.
Track overtime hours, call-offs, late finishes and drive time monthly. When overtime climbs for three months running, the answer is usually a hire or a price increase.
Fatigue is a safety input on electrical work, not a comfort issue. A crew on six tens is not the crew to plan a de-energization.
Federal overtime, timekeeping and recordkeeping duties are summarized at the DOL compliance assistance page for small business. State rules can be stricter.