power, distribution, electricity, electrical, isolator, tower, electricity, electricity, electricity, electricity, electricity, electrical, electrical, electrical, electrical, electrical. Electrical Contractor Overhead Costs: What Drives Them
Photo by 2427999 on Pixabay

Guides

Electrical Contractor Overhead Costs: What Drives Them

How rent, travel time, fuel, permits and labor burden drive electrical contractor overhead costs, and why metro and rural markets recover them differently.

What to take away

  • Electrical contractor overhead costs track geography, not just accounting. Metro rent and permits push them up, and rural travel time pushes them up differently.
  • Travel time is the largest swing between metro, suburban and rural operating costs. Fuel is a rounding error next to it.
  • A rural contractor can pay less rent and still need a higher recovery rate per billable hour than a metro competitor.
  • Recover overhead through billable field hours, then set the multiplier by market rather than by job type.

Where overhead lands in the numbers

Overhead is every cost you carry whether or not a van leaves the yard: rent, insurance, vehicles, office payroll, software, licensing and marketing. Direct costs are field labor and material tied to one job.

The overhead percentage is total overhead divided by revenue, and it sets the multiplier you apply to direct job costs. Two contractors can charge the same rate and land at different margins, because their percentages differ.

The IRS lists most of these lines as deductible business expenses in Publication 535, Business Expenses, so the percentage has a tax dimension as well as a pricing one.

Rent, yard space and shop costs across three markets

Metro contractors rent small industrial units at the top of the local market. Suburban shops sit in cheaper parks with room for a yard. Rural shops often run from owned property, which lowers cash rent and hides capital.

Overhead Lines by Market

Metro

Shop, yard, parking
Highest rent
Permit and inspection
Several jurisdictions
Travel time per call
Shortest
Helper wages
Deep pool
Van stock depth
Shallow

Suburban

Shop, yard, parking
Middle park
Permit and inspection
County plus city
Travel time per call
Middle
Helper wages
Middle
Van stock depth
Middle

Rural

Shop, yard, parking
Often owned
Permit and inspection
Single county
Travel time per call
Longest
Helper wages
Thin pool
Van stock depth
Deep

Substitute your own numbers before you set a rate.

Rent, yard and shop costs

Metro

Shop, yard and parking
Highest rent per square foot
Permit and inspection fees
Several jurisdictions
Travel time per completed call
Shortest, dense stops
Helper wages and recruiting
Deep pool, high wage
Van stock depth
Shallow, supply house nearby

Suburban

Shop, yard and parking
Middle, small industrial park
Permit and inspection fees
County plus one city
Travel time per completed call
Middle
Helper wages and recruiting
Middle
Van stock depth
Middle

Rural

Shop, yard and parking
Lowest, often owned
Permit and inspection fees
Single county
Travel time per completed call
Longest, empty miles
Helper wages and recruiting
Thin pool, owner trains
Van stock depth
Deep, more cash tied up

Travel time and the real cost per mile

Fuel gets the attention. The loaded hourly cost of the electrician in the driver's seat gets the money. A 45 minute drive between two calls is time you cannot bill.

Cost per mile carries fuel, insurance, depreciation, tires, maintenance, registration and the replacement cycle. Add the driver's loaded hourly rate and unpaid windshield time. Route density moves this number more than fuel prices do.

Three common ways to price it:

Travel time and cost per mile

  1. Absorb travel into the hourly rate, with a minimum service call charge covering the first hour.
  2. Bill a zone trip charge, with the first 15 minutes inside your core area included.
  3. Bill portal to portal outside that zone, and print the clock rule on the invoice first.

Example: one service call, two route densities

Example numbers only, built so you can swap in your own. Assume a loaded field cost of $65 per billable hour and a van cost of $0.75 per mile.

Rural Call Starts $75 Behind

  • 43 minextra unbillable labor
  • 38 miextra distance per call
  • $46unbillable labor cost
  • $29extra mileage cost

A metro stop sits 12 minutes and about 4 miles from the previous job. A rural stop sits 55 minutes and about 42 miles away. The gap is 43 minutes and 38 miles per call.

At $65 per hour, the extra 43 minutes is roughly $46 of unbillable labor. The miles add about $29. A rural call starts $75 behind a metro call before the first tool comes out.

Permits, inspections and jurisdiction count

Metro work crosses city, county and sometimes special district lines. Each authority having jurisdiction keeps its own fee schedule, inspection window and correction list.

Rural work usually deals with one county. The cost moves to inspection scheduling instead. If the inspector covers a large territory, a failed inspection can cost a half day.

Helpers, labor burden and van stock depth

Wage is not cost. Payroll taxes, workers compensation, general liability, paid time off, a truck and a phone sit on top of the hourly rate.

The Bureau of Labor Statistics reports electrician wages by metro area in its Occupational Employment and Wage Statistics survey, which is a starting point for that line.

A thin rural labor pool means you train helpers who leave for a metro wage. Contractors who also work near the Canadian border can compare provincial WCB premium rates, because workers compensation rate groups differ by province.

Recovering overhead without guessing

A rural contractor paying lower rent can still need a higher recovery rate per billable hour than a metro competitor. The rent line falls; the travel time and call density lines rise.

Pick one recovery base and keep it. Hourly recovery suits service work, and percentage of job cost suits project work.

Managing overhead is a cash flow exercise as much as a pricing one, and the U.S. Small Business Administration's guidance on managing business finances covers the review cadence.

Geography also decides where the next truck goes. Demand in the next few years is tracking data centres and grid upgrades, and those loads cluster by grid capacity rather than by population.

Overhead geography is one input. This site's coverage of electrical contractor business operations handles the rest.

Common questions

Does a rural electrical contractor really run lower overhead than a metro one?
Not per billable hour, usually. Rural rent is lower, but travel time and thin call density raise the cost of every completed job.
How do I find my own overhead percentage?
Add twelve months of indirect costs and divide by twelve months of revenue. Then divide direct job cost by one minus that percentage.
Can I bill travel time to customers?
In many markets you can, if the rule is printed and applied the same way every time. Zone charges and portal to portal billing both beat surprise line items.
Do payroll premiums change the answer in Canada?
Yes. Provincial rate groups, payroll bases and experience programs move labor burden, so Canadian contractors should build the percentage from provincial numbers.

More in Guides

Latest from Standards Desk